Search

Kevin Umbehr Phones & Addresses

  • 1808 Pembrook Cir, Conroe, TX 77301
  • 9087 Rose Canyon Dr, Conroe, TX 77302
  • San Antonio, TX
  • 10 Firethorn Pl, Spring, TX 77382
  • 2 Stony Bridge Cir, Spring, TX 77381 (281) 419-9041
  • The Woodlands, TX
  • Glendale, CA
  • Huntsville, TX
  • Montgomery, TX

Resumes

Resumes

Kevin Umbehr Photo 1

Vice President Of Business Development

View page
Location:
Houston, TX
Industry:
Oil & Energy
Work:
Bake Hughes since May 2012
Commercial Manager, US Land Pressure Pumping

Baker Hughes Apr 2009 - Nov 2012
Strategic Sales Manager,
Education:
Sam Houston State University 1978 - 1981
Master of Business Administration (M.B.A.), Marketing
Skills:
Oilfield
Upstream
Petroleum
Pumps
Oil and Gas Industry
Drilling
Cement
Natural Gas
Oil and Gas
Pressure
Offshore Drilling
Onshore
Oil/Gas
Gas
Energy
Energy Industry
Petroleum Engineering
Completions
Completion
Procurement
Oilfield Sales
Commercial Tendering
Customer Support
Sales Management
Customer Engagement
Corporate Sales Management
Customer Service
Customer Oriented
Customer Satisfaction
Drilling Engineering
Onshore Operations
Supplier Negotiation
Contract Negotiation
Kevin Umbehr Photo 2

Strategic Sales Manager (Team Leader) At Baker Hughes

View page
Position:
Strategic Sales Manager (Team Leader) at Baker Hughes
Location:
Houston, Texas Area
Industry:
Oil & Energy
Work:
Baker Hughes
Strategic Sales Manager (Team Leader)
Kevin Umbehr Photo 3

Sales Manager At Baker Hughes

View page
Position:
Sales Manager at Baker Hughes
Location:
Houston, Texas Area
Industry:
Oil & Energy
Work:
Baker Hughes
Sales Manager

Publications

Us Patents

Method Of Preparing Sea Bed For Jack Up Rig Deployment

View page
US Patent:
20080198685, Aug 21, 2008
Filed:
Feb 15, 2007
Appl. No.:
11/675449
Inventors:
Kevin B. Umbehr - The Woodlands TX, US
International Classification:
B28C 7/04
US Classification:
366 8
Abstract:
A method of filling seabed holes involves vessels that locate the holes with sonar and one of which has onboard capabilities for storage of a solid and mixing it with liquid to create a pumpable slurry. The slurry is delivered through a coiled line that is fed out overboard and the end of the line is held in position by maintaining the vessel at the desired location during slurry pumping. The hose end can be held fixed or progressively raised during slurry delivery, depending on the starting depth. The hose further has an end feature that counteracts the tendency of the hose to whip from the force created by the pumped slurry exiting the end. The slurry encounters a plate at the hose end with lateral exits preferably equally spaced circumferentially to maintain the hose end in a steady position as the slurry is delivered.
Kevin B Umbehr from Conroe, TX, age ~63 Get Report